What a complete scope must answer
Before work on Supply and return imbalance, the scope should state the suspected source, affected route, accessible evidence, unresolved alternatives and the condition that will be checked after work.
Source control comes before appearance
A scope that only cleans, paints, seals, tightens or replaces the visible finish does not explain how fans, stack effect, wind and duct imbalance move air through both intended and unintended routes will be controlled. The source-control action and its limit should be written separately.
Affected layers and adjacent systems
List the layers around bedroom, closed room, stairwell, mechanical zone, return-air path or exterior boundary that may need inspection, drying, isolation or protection. Include electrical, plumbing, ventilation, structural and hazardous-material boundaries where relevant.
Exclusions and uncertainty
State what has not been inspected and which alternatives remain possible: insufficient outdoor air, duct imbalance, envelope leakage, blocked transfer path and room-specific heat gain or loss. This protects the investigation from becoming more certain than the evidence.
Verification clause
Define the comparable trigger, waiting period, locations and method that will be used to judge the result. Immediate cosmetic improvement is not a verification plan.
When the house is not ready for a repair scope
Pause when the source is unbounded, the original evidence has not been recorded, safety limits are crossed or different causes require incompatible work. The source set for this guide includes 4 official records selected for this path. They provide general technical and safety context; they do not determine the condition of a particular house.
Primary references for this topic family
These references ground the general building-science or safety context. They do not diagnose a specific house, replace local requirements or certify a repair.