12 complete symptom paths42 guides and 60 questions in each1,460 Grade A articlesOne searchable, connected knowledge library140 official sourcesEvidence context with explicit limits
Water before the wall

Site drainage and foundation map

Follow rain from roof area to discharge, grade, drains, soil and the foundation boundary.

Active system layer Site and roof drainage

Follow rain from roof to gutter, downspout, grade, drains and foundation boundaries.

8scenes49hotspots28simulations36reactions
Drainage layer activeChoose a numbered hotspot to inspect the route.
01
Selected clue point

Gutter overflow

Concentrated eave runoff beside the wall.

Open connected dossier →
The Living House method

Same building. Different hidden stories.

01Choose the location02Switch the system layer03Follow a plausible pathway04Verify against the real house
Failure simulations

Watch the pathway unfold

Each simulation separates trigger, transport route, visible symptom and verification.

All simulations in this scene →
Material Reaction Lab

See what the layer does to the material

Materials record exposure differently. Their response can reveal a pathway without proving the source.

Open the full laboratory →
Take the observation back to your house

The diagram suggests routes.
The real trigger decides.

Describe what changed, where it happened and what weather or operating cycle came first.